Monday, 01 June 2009 09:43

Kirkwood Creek Turbidity/Conductivity Testing

Written by
Rate this item
(0 votes)

(April – June 2009): Collect turbidity, conductivity, pH, and temperature data points twice weekly for the USFS at two locations on Kirkwood Creek and at Oyster Creek. The work will continue through the end of Spring Run-off in June.

Read 621 times Last modified on Saturday, 04 April 2015 23:42

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.

Support SSTU

Please consider supporting our efforts.

Amount:
IMG_1711.jpg

Shop Amazon - Support SSTU

amazon smile small