(April – June 2009): Collect turbidity, conductivity, pH, and temperature data points twice weekly for the USFS at two locations on Kirkwood Creek and at Oyster Creek. The work will continue through the end of Spring Run-off in June.
(April – June 2009): Collect turbidity, conductivity, pH, and temperature data points twice weekly for the USFS at two locations on Kirkwood Creek and at Oyster Creek. The work will continue through the end of Spring Run-off in June.